pile load test การใช้
ประโยค
- The design parameters used for the South Tower piles were later confirmed by a pile load test.
- The authors concluded that the Army Corps of Engineers had misinterpreted the results of a Sheet Pile Load test ( E-99 Study ) they conducted in the mid 1980s.
- Furthermore, the Corps, in a separate attempt to limit project costs, initiated a sheet pile load test ( E-99 Study ), but misinterpreted the results and wrongly concluded that sheet piles needed to be driven to depths of only 17 feet ( 1 foot ?0.3048 meters ) instead of between 31 and 46 feet.
- According to an article published in the August 2015 issue of the official journal of the World Water Council, the Army Corps of Engineers misinterpreted the results of a Sheet Pile Load test ( E-99 Study ) conducted in the mid 1980s and concluded they needed to drive sheet pilings to depths of not more than 17 feet, rather than the necessary 31 to 46 feet.
คำอื่น ๆ
- "pile driver" การใช้
- "pile dwelling" การใช้
- "pile foundation" การใช้
- "pile hammer" การใช้
- "pile head" การใช้
- "pile height" การใช้
- "pile high" การใช้
- "pile in" การใช้
- "pile into" การใช้
- "pile it on" การใช้
- "pile off" การใช้
- "pile on" การใช้
- "pile onto" การใช้
- "pile out" การใช้
- "pile penetration" การใช้
- "pile rig" การใช้
- "pile shoe" การใช้
- "pile up" การใช้
- "pile with" การใช้